Message from the system: You need to be logged in to share images. You can either log in or create a new user.

WANDERER, MMSI: 338432206

flag-

Images of WANDERER

📸 Upload a photo

Share a photo of WANDERER. Uploading a photo takes less than a minute and can be done from your phone, tablet or laptop.

About the ship

Owner

[add]

MMSI

338432206

Callsign

[add]

Sail number

[add]

Lenght

18m / 59.1ft

Draft (depth)

[add]

Height

[add]

Width

4m / 13.1ft

Ship type

Sailing Vessel

Builder and make

[add]

Year build

[add]

Engine

[add]

Edit the ship info

Journey statistics

Preferred harbour type

2026

50% marina

natural harbour 50%

2025

50% marina

natural harbour 50%

2024

25% marina

natural harbour 75%

2022

100% marina

natural harbour 0%